These
notes were recorded from the comments attendees made as part of
the analysis and master plan considerations of the second
All-College discussion.
|
|
ITEM
|
NOTES
|
|
|
Master
Plan Analysis
|
-
|
Entrances
|
|
|
Audience
shared need of better identifiable entrances on three spots on
campus:
Intersection
from Farm Hill Road to Building 3 and lots 2 and 3
Intersection
from Farm Hill Road and Cañada Road to lots 5 and 6 past
Building 1
Access
between Parking lot 8 and Building 22
Recent
improvements on Farm Hill entrance were acknowledged
|
-
|
Consolidation
of outdoor Spaces
|
|
|
Master
plan analysis of outdoor spaces was presented:
Definition
of some outdoor spaces, such as space north of Buildings 16, 17
and 18
Soft
edge along pathway that runs from Building 22 to Building 8
Possible
access to ground level of building 6 thru walkway along parking
lot 5
|
-
|
Circulation
|
|
|
Audience
acknowledges that section of road that traverses campus between
Buildings 1 and 3 needs improvement to manage interface between
pedestrian and vehicle.
Audience
stated that traffic consist of both college and neighbor vehicular
circulation from and to Farm Hill and Cañada Road. Some
attendees recommended restricting access to the campus to only the
College Community.
There
was consensus that road improvements from the intersection from
lots 2 and 3 past Building 1 decent to Cañada Road and to
the athletic fields needs improvements to manage interface between
pedestrians and vehicles. Some mechanisms to achieve improvements
were discussed, such as:
Managing
width of road,
Incorporating
landscaping,
Utilization
of bumps following District standards
Improvement
of vehicular signage
Other
considerations for road improvements in different areas of campus:
Consider
construction of Jogging Trails/Walking
Provide
safe pathway to tennis courts
A
question was raised about a potential conflict with incorrectly
using the fire road as a drop-off at Building 9.
Attendees
anticipates changes on vehicular circulation pattern after
completion of Building 9. Some recommended to shift/and or adding
a bus stop from current location to Parking Lot 1.
There
were specific concerns about the lack of clear vehicular
signage. Ongoing way finding project will be reviewed
|
|
4.
|
Parking
space
|
|
|
Audience
expressed their perception of not enough parking space
|
|
5.
|
Future
plans for Faculty and Staff Housing
|
|
|
Location
of future plans for Faculty & Staff Housing were discussed
(current location of tennis courts OR current Parking lot 7). If
applicable, tennis courts relocation within the athletic area was
requested
Audience
proposed a third location for housing near Cañada Road
entrance
|