CSM Building 10N (Student Center) Design Build Project
Building 10N
Photos Floorplans
Project Description:

Building10N, located near the center of campus, will place critical student services into the heart of the campus alongside division offices and up to 250 faculty. B10N will embody CSM’s collaborative nature and student-oriented service philosophy to strengthen student convenience and access as well as encouraging interdisciplinary faculty dialogue and interactions between faculty and students. The facility will unite Student Services into a “One-Stop Shop”, including Admissions, Career Services, Counseling, Health Center, Financial Aid, Disabled Students Programs & Services, Student Activities, Welcome Center, Cafeteria, and Bookstore. This One-Stop-Shop approach will allow CSM to greet new students with a clear understanding of a personalized college experience, as well as provide continued and convenient centralized access student services near the academic core of the campus. B10N will also house the new Integrative Learning Center (ILC), a centralized tutorial and student support lab where students can get assistance across the disciplines from writing and mathematics to speech communication and foreign languages, and will be an inspired learning environment where students will feel comfortable giving and getting academic assistance. This new building is targeted to receive LEED certification (Leadership in Energy and Environmental Design), demonstrating CSM’s commitment to sustainable building design and construction.

In an effort to attain the LEED silver certification for green design, the demolished building concrete and steel from demolition will be recycled and reused. In addition this building will use an innovative design for the return air back to the heating and air conditioning system. The grand central stair serves as not only a major design statement but also as the main return path for air during heating and cooling thus greatly reducing the number of return fans that would be needed for a system that relies on ductwork overhead to return the air.

Schedule
  • Design Phase: March 2008 – April 2009
  • Building Abatement and Demolition: January 2009 – April  2009
  • Construction Phase:  April 2009 – May 2011
  • Building Preparation: May 2011 – August 2011
  • Anticipated Move In:  Fall Semester 2011
Status:

In design.

CSM Design-Build Project Manager: Joe Millsaps
Telephone: 650-378-7347
E-Mail millsapsj@smccd.edu
Building 10N Project Coordinator: Karen Pinkham
Telephone: 650-358-6714
E-Mail pinkhamk@smccd.edu
Bridging Architect: Steinberg Architects
Design Build Contractor: McCarthy Building Companies, Inc.
Funding
Source(s):
Measure A general obligation bond funds and COP funds

Project Documents

Facilities Planning & Operations
Phone: (650) 574-6512
Fax: (650) 574-6574

San Mateo County Community College District
3401 CSM Drive
San Mateo CA 94402

Construction Planning Department
Phone: (650) 358-6785
Fax: (650) 358-6764

spacer   
   
spacer
spacer

Copyright 2006 © San Mateo County Community College District. All rights reserved.
Questions? Contact the Webmaster
OmniUpdateLast Updated: 5/17/07 9:58 PM