HOME
»
Skyline College Building 3 Construction Photos
(62 Slides)
[Page 1 of 5]
::
Jump To
- Page 1
- Page 2
- Page 3
- Page 4
- Page 5
01 1st floor corridor before drywall
02 Area of restroom addition before construction
03 Completed streel truss in gymnasium
04 Gymnasium ceiling before construction
05 Infrastructure rerouting
06 Installation of manholes
07 Manhole and retaining wall footing @ new restroom
08 Multi-purpose room before construction
09 Multi-purpose room wall plates
10 Roof after demolition and structural upgrades
11 Roof work prior to demolition
12 Sanitary Sewer and Storm Drain Manhole
13 Steel angles in gym
14 Storm drain tie-in
15 Trusses going into gym
Album last updated on 07/20/2009 15:20
©2009 San Mateo County Community College District