HOME  »  Skyline College Building 8 Modernization  (57 Slides)     [Page 1 of 4] :: Jump To  
  You have reached the first page You have reached the first page      HOME      Next page Last page Help
01 2005 0909 1st Flr demo (1) * 800 x 600
02 2005 0909 1st Flr demo (2) * 450 x 600
03 2005 0916 Classroom wall demo * 450 x 600
04 2005 0916 Existing wall studs * 450 x 600
05 2005 0916 First Floor Bathroom * 450 x 600
  01 2005 0909 1st Flr demo (1)  
  02 2005 0909 1st Flr demo (2)  
  03 2005 0916 Classroom wall demo  
  04 2005 0916 Existing wall studs  
  05 2005 0916 First Floor Bathroom  
06 2005 0916 Hallway conduits first floor * 450 x 600
07 2005 0920 access road (1) * 800 x 600
08 2005 0920 access road * 800 x 600
09 2005 0922 access road (1) * 800 x 600
10 2005 0922 access road * 800 x 600
  06 2005 0916 Hallway conduits first floor  
  07 2005 0920 access road (1)  
  08 2005 0920 access road  
  09 2005 0922 access road (1)  
  10 2005 0922 access road  
11 2005 0930 Bathroom Riser * 450 x 600
12 2005 0930 Existing Penetrations * 800 x 600
13 2005 0930 Plaster framing above ceiling * 800 x 600
14 2005 0930 Plaster surrounds existing pipes * 450 x 600
15 2005 0930 Wall above ceiling * 800 x 600
  11 2005 0930 Bathroom Riser  
  12 2005 0930 Existing Penetrations  
  13 2005 0930 Plaster framing above ceiling  
  14 2005 0930 Plaster surrounds existing pipes  
  15 2005 0930 Wall above ceiling  
Album last updated on 07/21/2009 16:31:36